CS615 - Software Project Management
Quiz No. 2 May, 04, 2012
Software design is actually a multi step process that focuses on _______ distinct attributes of a program
2
3
4
5
When you build a product or system, it's important to go through a series of predictable steps – a road map that helps you create a timely, high-quality result, The road map that you follow is called a __________
Software design
Software Process
Software schedule
Framework
The check-in and checkout facilities provide___________
Best control
Component control
SCI control
Synchronization control
Which of the following might require re-baselining of the cost baseline?
Corrective action
Revised cost estimates
Updates to the cost management plan
Budget updates
Once the review is complete, the Software Requirements Specification is "signed-off by _________
Developer
Customer
Top level Management
Both Customer and Developer.
REF:: Once the review is complete, the Software Requirements Specification is "signed-
off by both the customer and the developer.
Controlling Versions is activity of ________
Construction
Testing
SCM
Design
________ identify which quality standards are relevant to the project and determines how to satisfy them
Quality planning
Quality assurance
Quality control
Process control
The British Standards Institution (1986) has stated the quality as
The ability of a software product to satisfy its specified requirements
"An inherent or distinguishing characteristic or a property"
"Quality is in the eye of the beholder, a matter, of the client's judgment."
All of the given
________ ensures that the standards laid down for a project are followed.
Quality assurance
Quality control
Product evaluation
Process control
________ ensures that appropriate steps to follow the product development procedures are carried out
Quality Management
Design
Process monitoring
Quality Control
These all are Product Revision Factors except
Usability
Maintainability
Flexibility
Testability
To control versions, you can use_____________
Version Control File
Version Control Register
Version Control authority
All of given
_________is an umbrella activity that ensures conformance to standards and procedures throughout the SDLC of a software product.
SQA
Design
Testing
All of given
All of the following are benefits of meeting quality requirements
An increase in stakeholder satisfaction
Less rework
Low turnover
Higher productivity
The Preliminary Users Manual presents the software as a black box: That is, heavy emphasis is placed on
User input
User output
User input and the resultant output
None of given
Which of the following might require re-baselining of the cost baseline?
Corrective action
Revised cost estimates
Updates to the cost management plan
Budget updates
________ identify which quality standards are relevant to the project and determines how to satisfy them
Quality planning
Quality assurance
Quality control
Process control
The overall role of Software in a larger system is identified during
Requirements engineering
Process engineering
System engineering
All of given
The British Standards Institution (1986) has stated the quality as
The ability of a software product to satisfy its specified requirements
"An inherent or distinguishing characteristic or a property"
"Quality is in the eye of the beholder, a matter, of the client's judgment."
All of the given
www.vuzs.net
McCall (MCC77) and his colleagues proposed some software quality factors based on _______ most important aspects of a software product:
4
3
6
5
Inefficient project management style is a
Product-related problems
Technology-related problems
Process-related problems
People-related problems
Upon evaluating current problems and desired information (input and output), the analyst begins to ______
Synthesize solutions
Model
Specification
All of given
These all are Product Revision Factors except
Usability
Maintainability
Flexibility
Testability
We can classify the problems that affect software projects into _______ categories
3
4
5
6
The check-in and checkout facilities provide_________
Best control
Component control
SCI control
Synchronization control
The code generation step performs the task
Translated specification into a machine-readable form
Translated design into a machine-readable form
Translated requirements into a machine-readable form
Translated user data into a machine-readable form
Research-oriented software development is a
Technology-related problems
Process-related problems
People-related problems
Product-related problems
A meeting is conducted at a _______ and attended by both software engineers and customers.
Software engineer site
Neutral site
Customer site
Company site
Reviews conducted at each of this phase/s_____
Analysis
Design
Coding
All of given
All given below are the problems that affect software projects except:
Product-related problems
Technology-related problems
Procedure-related problems
People-related problems
_______is the technical kernel of software engineering
Design
Implementation
Testing
Requirement Analysis
Both the software engineer and customer take an active role in software requirements engineering-a set of activities that is often referred to as
Analysis
Design
Specification
System acceptance
The model serves as the basis for the creation of ______ for the Software.
Design
Maintenance
Testing
Specifications
Before requirements can be analyzed, modeled, or specified they must be gathered through a/an _______
Elicitation process
Interviewing
Meeting
None of given
Technology-related problems include _____
Overestimated savings from reusable components and new tools and methods
Switching tools in mid-way
Integrating different software products in cross-platform implementation
All of given
Insufficient identification is a
Technology-related problems
Process-related problems
People-related problems
Product-related problems
Throughout evaluation and solution synthesis, the analyst's primary focus is on ______
"Not what, not "how"
"What, also "how"
"What, not "how"
None of given
The overall role of Software in a larger system is identified during
Requirements engineering
Process engineering
System engineering
All of given
In problem evaluation area of effort, once problems have been identified, the ___________determines what information is to be produced by the new system and what data will be provided to the system.
Analyst
Designer
Coder
Manager
A 'facilitator' controls the meeting can be ________
Customer
A developer
An outsider
All of given
Version control combines ______ to manage different versions of configuration objects that are created during software product development.
Procedure
Tools
Procedure and Tools
None of given
Many software projects digress from the original scope because of the nature of the software product or technology used, it's happen in ________
Product scope changed toward the end of the project life cycle
Research-oriented software development
Defined scope
Fuzzy users
When you build a product or system, it's important to go through a series of predictable steps – a road map that helps you create a timely, high-quality result, The road map that you follow is called a ________
Software design
Software process
Software schedule
Framework
Before requirements can be analyzed, modeled, or specified they must be gathered through a/an _______
Elicitation process
Interviewing
Meeting
None of given
Defined scope is a
Technology-related problems
Product-related problems
Process-related problems
People-related problems
You can use the Item Traceability Matrix to identify _______ at the end of each phase
SCIs
SCM
Design
Construction
Most software project manager's practice a lot of management techniques that are of doubtful authenticity are called
Select correct option:
Project management tools
Project management myths
Project management thumb rules
Project management fundamentals
The Introduction of the software requirements specification states the
Select correct option:
Goals
Objective
Design
Goals and objectives of the software
The code generation step performs the task
Select correct option:
Translated specification into a machine-readable form
Translated design into a machine-readable form
Translated requirements into a machine-readable form
Translated user data into a machine-readable form
-----------is the ability to encourage by "push or pull" technical people to produce to their best ability.
Select correct option:
Evaluating
Motivation
None of the given
Monitoring
__________contains an analysis of what went wrong, what went right, and what you could have done better in the software project.
Select correct option:
Prepare closedown report
Identify learning
Identify reusable software components
Finally, the specification includes a ________
Select correct option:
Bibliography
Appendix
Both Bibliography and Appendix
Product quality depends on its conformance to ______
Select correct option:
Software requirements
Development standards
Implicit requirements
All of given
Given all are major design styles except
Select correct option:
Object (Not Sure)
Procedural
Structured
Dtat-Structured Design
The quality of software is said to be high if it meets the
Standards, defined for the product
Procedures, defined for the product
Standards and procedures, defined for the product
Design defined for product
Zindagi mein 2 Logo ka buhat khayal rahkoooo
2nd woh jiss ko tum ney har dukh me pukaara hoo (Mother)
--
Please visit http://vusr.net for Old and Latest Papers, Assignments, Quiz and GDBs.
http://VUSR.net The ultimate VU Study Resource
You received this message because you are subscribed to the Google
Groups "VUSR" group.
To unsubscribe
vusr+unsubscribe@googlegroups.com
To Visit Group Home Page
http://groups.google.com/group/vusr?hl=en?hl=en
No comments:
Post a Comment