Friday, 27 April 2012

[VUSR] 65366 CS605 Software Engineering-II Quiz

CS605 Software Engineering-II

Quiz

 

 

In context of moving range and individual control charts, UNPL stands for:

Select correct option:

Universal Natural Process Line

Universal Natural Process Limit

Upper Natural Process Limit

Upper Natural Process Line

 

Effort required to test a program to ensure that it performs its intended function __________

Testability

Bug fixing

Debugging

Security

 

Question # 8 of 10 ( Start time: 02:08:47 PM )

The extent to which a program can be expected to perform its intended function with required precision is called ______

Usability

Reliability

Portability

Maintainability

 

Question # 1 of 10 ( Start time: 06:23:45 PM ) Total Marks: 1

___________ help in finding the matrix to be stable or unstable

Select correct option:

Control chart

Directed Graph

Cyclic chart

Base line graph

 

------------------give you a better insight into the state of the process or product.

Select correct option:

Metrics

Efficiency

Reliability

Usability

 

Determination of the ....................is a pre-requisite of all sorts of estimates, including,

resources, time, and budget.

Select correct option:

software scope

software Risk

software Quality

software Management

 

We need to employ some statistical techniques and plot the result ---------------. This is

known as statistical control techniques.

Select correct option:

Graphically

Automatically

Manually

Personally

Question # 6 of 10 ( Start time: 06:26:59 PM ) Total Marks: 1

When more than one user interpret the same requirement in different ways then we can

say that the requirements are

Select correct option:

None of the given

Incomplete

Ambiguous not sure

Incorrect

 

Question # 7 of 10 ( Start time: 06:28:02 PM ) Total Marks: 1

The extent to which a program satisfies its specifications and fulfills the customer's

mission objectives is …………………

Select correct option:

Integrity

Reliability

Correctness

None of given

Quiz Start Time: 06:23 PM

Time Left 89

sec(s)

Question # 9 of 10 ( Start time: 06:28:52 PM ) Total Marks: 1

In case some software, it is extremely easy to operate with intuitive interface conforming

to most excellent GUI practices of the industry. It needs very little training -----------------

Select correct option:

Less than one hour

Less than two hour not sure

Less than five hour

Less than ten hour

 

Metrics to assess the quality of the analysis models and the corresponding software

specification were proposed ............

Select correct option:

in 1993- 1999.

Ricado in 1993

Davis in 1990

Davis in 1993

 

 Which statement is correct?

Select correct option:

None of the given not sure

The greater the dependency between the components the lesser is coupling

The lesser the dependency between the components the greater is coupling

The greater the dependency between the components the greater is coupling

 

Function/Test matrix is a type of

Select correct option:

Interim Test report

Final test report

Project status report not sure

Management report

 

The most important objective of any engineering activity is to produce high quality

product with limited resources and-----------------------

Select correct option:

Time

Persons

Cost

Metrics

 

Extent to which access to software or data by unauthorized persons can be controlled and

called ……….…

Select correct option:

None of given

Efficiency

Reliability

Integrity

 

The amount of computing resources required by a program to perform its function is

…………………..

Select correct option:

Efficiency

Integrity

Reliability

None of given

 

.........technique was initially developed for manufacturing processes in the 1920's by

Walter Shewart.

Select correct option:

Upper Control Line

Control chart

CMP

Quality

 

 

Several entities are always created -------------- and deleted together then this is a strong

indication that they should be grouped into ---------- logical file/files.

Select correct option:

Together, Single

Together, Multiple

Together, Double

All of the given

 

In measuring Software Process Quality by using control charts, if the gap between the

defects reported and defects fixed is increasing, then it means

Select correct option:

The product is in unstable condition.

The product is ready for shipment

The product is in stable condition.

None of the above

 

This chart is then used to develop the individual control chart is called statistical control

techniques.

Select correct option:

Yes

No

 

A --------------entity is the one which have any ----------- in the problem domain without

some other entity.

Select correct option:

Strong, Role*

All of the given

Weak, Function

None of the Given P # 47

 

of the ....................is a pre-requisite of all sorts of estimates, including, resources, time,

and budget.

Select correct option:

Software scope

software Risk

software Quality

software Management

 

ILF is a --------------- identifiable group of logically control in formations ------------- the boundary the application.

user, within

user, without

All of the given

user, along


--
Zindagi mein 2 Logo ka buhat khayal rahkoooo

Ist woh jiss ney tumhari jeet ke Liye buhat kuch hara hoo (Father)

2nd woh jiss ko tum ney har dukh me pukaara hoo (Mother)

Regards, 
Umair Saulat

--
Please visit http://vusr.net for Old and Latest Papers, Assignments, Quiz and GDBs.
 
http://VUSR.net The ultimate VU Study Resource
 
You received this message because you are subscribed to the Google
Groups "VUSR" group.
 
 
To unsubscribe
vusr+unsubscribe@googlegroups.com
To Visit Group Home Page
http://groups.google.com/group/vusr?hl=en?hl=en

No comments:

Post a Comment