[VUSR] 65226 CS 615 Quiz No.1 17 April 2012

CS615- Software Project Management

Quiz No.1

Dated: 17th April 20120

 

…………. theory when the deliverables of a project are more important than its phases. This normally happens when the deliverables are decided before the project begins. 

Select correct option: 

 

 Project life-cycle-based

 Scheduled

 None of given

 Deliverable-based

 

 

 Predecessor activities need to ------------ before the next can begin. After a predecessor activity is completed, the successor activity becomes the predecessor for another activity. 

 

Select correct option: 

Both start and end

End

Start

None of given 

 

Each …………. can be subdivided into sub tasks. 

Select correct option: 

None of given

Program

Task

Project

 

Using PERT and CPM, -----------------------, helps you complete a project on time. By using these techniques, you can determine the latest time by when an activity should start to be completed on time. 

Select correct option: 

Individually 

Combination

Individual and Combine (handouts, page 296)

None of given 

 

 

Over the course of the project, a comparison of the due date and the date delivered provides a metric for how well deliverable dates are ………………. by the project team. 

Select correct option: 

Met

Scheduled

None of given

Changed

 

Risk analysis and management are a series of steps that help a software team to understand and manage ------------------------. 

Select correct option: 

Uncertainty

Crises

none of given 

Problem

 

A node on a network schedule is that point in time at which an activity ----------------. 

Select correct option: 

Begins

Begins or Ends (handouts, page 297)

Ends

None of given 

 

To ------------------- risks from occurring, the project team prepares the risk plan before the commencement of the project. 

Select correct option: 

Avoid (handouts, page 312)

deal

None of given

Manage 

 

Like all engineering disciplines, requirements engineering is not conducted in a

Sporadic random

Otherwise haphazard fashion

But instead is the systematic use of proven approaches?

All of given

 

 

_____________ includes consideration such as the post-implementation support activities provided to the customer.

 

Training plan creation

User acceptance plan

Implementation plan creation

Support plan creation

 

 

 

Requirements are refined and analyzed to assess their clarity, completeness, and_______

 

Correctness

Consistency

Concurrency

None of given

 

 

 

__________ defines the duration of implementation and the hard and software perquisites for implementing the software product.

 

Training plan creation

User acceptance plan

Implementation plan creation

Support plan creation

 

 

Implementation of software quality often associated with

Project Manager - unconfirmed

Software developer

Customer

User

 

 

 

 

A software project that meets all the stated objectives is a success of _________

 

Project quality

Project fundamental purpose 

Project management myth

Project requirement

 

 

 

Throughout evaluation and solution synthesis, the analyst's primary focus is on ________

Select correct option: 
"Not what, not "how"
"What, also "how"
"What, not "how"
None of given

 

Like all engineering disciplines, requirements engineering is not conducted in a
Select correct option: 
Sporadic random
Otherwise haphazard fashion
But instead is the systematic use of proven approaches?
All of given

 

The Project Planning, Controlling and Tracking includes Task
elect correct option: 
Detailed Project Plan
Scope determination
initial project plan
Requirement gathering

 

Unstructured and hurried software development is a
Technology-related problems
Product-related problems
Process-related problems
People-related problems

 

 

 

A software project that meets all the stated objectives is a success of _________



Select correct option: 

Project quality
Project fundamental purpose 
Project management myth
Project requirement

 

We can classify the problems that affect software projects into _______ categories

3
4
5
6

4

 

Software requirements engineering is a process of all except

Select correct option: 
Discovery 
Refinement
Design
Specification

 

Unproductive work environment is a
Select correct option: 

Technology-related problems
Process-related problems
People-related problems
Product-related problems

 

Both the software engineer and customer take an active role in software requirements engineering-a set of activities that is often referred to as

Analysis
Design
Specification
System acceptance

 

 

All of the following are types of project closures or endings except:

Addition
Integration 
Verification
Extiction

Project Quality Management includes the --------------- required to ensure that the project will satisfy the needs for which it was undertaken

 Select correct option:

Time

Cost

Processes

None of the given

 

 


--
Zindagi mein 2 Logo ka buhat khayal rahkoooo

Ist woh jiss ney tumhari jeet ke Liye buhat kuch hara hoo (Father)

2nd woh jiss ko tum ney har dukh me pukaara hoo (Mother)

Regards, 
Umair Saulat

--
Please visit http://vusr.net for Old and Latest Papers, Assignments, Quiz and GDBs.
 
http://VUSR.net The ultimate VU Study Resource
 
You received this message because you are subscribed to the Google
Groups "VUSR" group.
 
 
To unsubscribe
vusr+unsubscribe@googlegroups.com
To Visit Group Home Page
http://groups.google.com/group/vusr?hl=en?hl=en

No comments:

Post a Comment